Factory-Ready OEM/ODM Spec Sheet Preview
Matter over Thread Smart Plug Pilot
Pre-PO Engineering Alerts
- Dual-voltage review — specify separate regional SKUs unless load tests, rating labels and plug variants support a universal-input design.
1. Hardware & Protocol Architecture
- Product category: Energy, power & automation.
- Power source: AC mains. Submit input ratings, maximum load and connector drawings.
- Protocol stack: Matter, Thread. Identify supported transports, gateway dependencies and tested firmware versions.
- Camera or microphone: excluded. Safety-critical lock or shutoff: excluded.
2. Multi-Market Grid & Regulatory Compliance Matrix
Confirm applicable requirements with the lab for the exact model and destination. Attach matching reports and label artwork.
| Destination & grid | Evidence & customs traps |
|---|---|
| Brazil 127V / 220V AC · 60 Hz (varies by Brazilian state — bivolt required) Type N (NBR 14136 3-pin, 10A / 20A) | Labeling · Brazilian Portuguese (Anatel homologation label/ID, Inmetro seal & Portuguese manual) Compliance gates
Top customs traps
|
3. Firmware, Privacy & Cloud Posture
- Local first, no subscription
- Demonstrate commissioning and core controls offline with no recurring subscription.
- Identify the firmware owner, update mechanism, support window and recovery procedure.
4. Packaging, Customization & Commercial Terms
- OEM logo & retail box. Provide logo placement and retail artwork proofs for buyer approval.
- Recyclable retail carton with FSC claim. Supply the carton dieline, material composition and evidence for the proposed FSC artwork.
- Requested quantity band: 100–500 units. Quote the actual MOQ by variant, unit price, tooling, freight basis, lead time and quote validity in writing.
5. Sample Evaluation, Golden Sample Sign-Off & AQL QC Acceptance Criteria
- Record the sample serial number, BOM, firmware and artwork revisions. Buyer and factory each retain a signed golden sample.
- Test pairing, power-cycle recovery and operation on each ordered power and protocol variant against the signed sample.
- Use AQL 2.5 major defects. Agree the inspection level, lot size, sample size, minor-defect AQL and accept/reject counts before drawing random units.
- Check carton artwork, warnings, plug and batch traceability against the destination file. Hold any lot with a critical safety defect.
- Attach results and defect photos. Obtain written release after rework and reinspection of any rejected lot.
6. Mandatory Factory Questionnaire
Provide written answers to all six questions before deposit.
- Which exact model, BOM revision, radio module and firmware build will you quote, and which requested features differ?
- Which reports cover each destination, plug and power variant, and what model identifiers and lab references can we verify?
- Which functions survive loss of internet, who controls device data, and who owns security updates through end of support?
- What are your quoted MOQ, sample and production lead times, itemized tooling charges, delivery terms and payment milestones?
- Which signed golden sample, packaging proof and lot inspection records will govern acceptance and substitutions?
- Who authorizes shipment after inspection, and what rework, retest and warranty remedies apply to a rejected lot?