Compare · up to 4
Side-by-side comparison
Pre-PO Procurement Audit
Screening of listed fields only. Confirm destination input ratings, plugs and documentation before a PO.
MOQ or sample terms need confirmation
1 selected SKU(s) lack documented MOQ or sample terms. Request written terms and confirm the supply route before a PO.
Review documentation before approval
2 selected SKU(s) are not marked Verified. Review evidence and open questions before a PO.
![]() | ![]() | |
|---|---|---|
| Category | Smart Accessories | Smart Accessories |
| ModelDiff | ZEN77 800LR | MK117 |
| Documentation | Docs under review | Docs under review |
| Sourcing trackDiff | MOQ or sample terms need confirmation | Documented MOQ/sample terms (verify factory terms before PO) |
| ProtocolsDiff | Other / Wired — see gateway | Wi-Fi, Matter, Bluetooth LE |
| AppDiff | SmartThings, Hubitat, Home Assistant, HomeSeer | Matter Ecosystems (Apple Home, Google Home, Alexa) / MOKO Energy App / MQTT Server |
| GatewayDiff | Z-Wave hub required; dimmer communicates over Z-Wave 800 Series (908.42 MHz, US) with S2 security and Long Range | Matter controller or direct 2.4 GHz Wi-Fi router; optional direct MQTT broker |
| AI / Cloud | N/A | N/A |
| PowerDiff | Hardwired 120 V AC, 60 Hz; 100 W LED or 300 W incandescent max load | 100-240V AC 50/60Hz, 16A maximum load |
| Plug / voltageDiff | Hardwired 120 V AC, neutral wire required | Regional mains plug and pass-through receptacle (US NEMA 5-15, EU Schuko CEE 7/7, UK BS 1363 variants) |
| DimensionsDiff | 1.75 in W x 4.1 in H x 1.16 in D | 75 x 50 x 38 mm; 85 g |
| Best forDiff | Z-Wave hubs such as SmartThings, Hubitat, and Home Assistant needing a long-range dimmer with S2 security | Energy management solution providers, building sub-metering contractors, and IoT software platforms seeking commercial smart metering plug hardware. |
| Key limitationDiff | Z-Wave hub required; neutral wire required; not for tube lights or low-voltage loads; Z-Wave is a regional radio standard on the US 908.42 MHz band. | Requires Wi-Fi network coverage at each outlet socket; maximum 16A resistive rating must not be exceeded on heavy inductive commercial motor loads. |
| MOQDiff | Unknown | Commercial / OEM tiered MOQ confirmed per configuration |
| SampleDiff | Unknown | Evaluation unit available via B2B desk / authorized OEM channel |
| Lead timeDiff | Unknown | Confirmed per regional SKU & customization scope |
| CustomizationDiff | Unknown | OEM/ODM, API integration & regional packaging scoped per volume |
| UpdatedDiff | 2026-11-11 | 2026-11-20 |
Preview your deliverable
accessories · Destination market to confirm
What we know now
Zooz ZEN77 S2 Dimmer 800 Series
Zooz · ZEN77 800LR
- Power
- Hardwired 120 V AC, 60 Hz; 100 W LED or 300 W incandescent max load
- Plug
- Hardwired 120 V AC, neutral wire required
- MOQ
- Unknown
- Sample
- Unknown
MOKO Smart MK117 Matter Smart Metering Plug
MOKO Smart · MK117
- Power
- 100-240V AC 50/60Hz, 16A maximum load
- Plug
- Regional mains plug and pass-through receptacle (US NEMA 5-15, EU Schuko CEE 7/7, UK BS 1363 variants)
- MOQ
- Commercial / OEM tiered MOQ confirmed per configuration
- Sample
- Evaluation unit available via B2B desk / authorized OEM channel
What our desk verifies
We request written terms and match lab reports to the proposed model and destination.
Zooz ZEN77 S2 Dimmer 800 Series · ZEN77 800LR
Request documentation for MOQ, Sample.
- Amazon US ASIN could not be directly verified; the ASIN seen on manuals.plus is indirect attribution only.
MOKO Smart MK117 Matter Smart Metering Plug · MK117
- Custom laser-engraved company logos and customized packaging MOQ thresholds
- Provisioning pre-generated Matter DAC certificates for commercial PKI roots
What you receive
A comparison of three factory responses with supporting evidence and outstanding requests.
| Terms | Factory A | Factory B | Factory C |
|---|---|---|---|
| FOB Tier | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| MOQ | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Sample Lead Time | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Primary Lab Cert Scope | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Tooling/Branding Terms | Awaiting evidence | Awaiting evidence | Awaiting evidence |
When the 48-business-hour clock starts
Delivered within 48 business hours after brief intake and material confirmation. The $199 audit fee is credited once toward your first qualifying SmartLife100 coordination fee. Includes 30 days of Radar Pro.

