Compare · up to 4
Side-by-side comparison
Pre-PO Procurement Audit
Screening of listed fields only. Confirm destination input ratings, plugs and documentation before a PO.
MOQ or sample terms need confirmation
1 selected SKU(s) lack documented MOQ or sample terms. Request written terms and confirm the supply route before a PO.
Review documentation before approval
2 selected SKU(s) are not marked Verified. Review evidence and open questions before a PO.
![]() | ![]() | |
|---|---|---|
| Category | Smart Home | Smart Home |
| ModelDiff | SigenStor EC (single-phase 5.0-12.0 kW / three-phase up to 30 kW controllers; battery modules BAT 5.0/6.0/8.0/9.0/10.0) | MINIR4M |
| Documentation | Docs under review | Docs under review |
| Sourcing trackDiff | MOQ or sample terms need confirmation | Documented MOQ/sample terms (verify factory terms before PO) |
| ProtocolsDiff | Wi-Fi, Bluetooth LE, 4G LTE | Wi-Fi, Matter, Bluetooth LE |
| AppDiff | mySigen app | Apple Home / Google Home / Alexa / eWeLink / Home Assistant |
| GatewayDiff | External hub or gateway required for full features (see specs) | Matter-certified ecosystem controller (Apple TV / HomePod, Google Nest Hub, or SmartThings) |
| AI / CloudDiff | No paid subscription documented; mySigen app monitoring, AI energy planning and OTA updates are included. Whole-home backup requires the separate Sigen Energy Gateway and provides 0ms switchover. The system must stay connected to the internet — installer sources report Sigenergy cuts the warranty to 5 years if the system is offline for more than one year in total; a 4G dongle is available where Wi-Fi does not reach. · No paid subscription documented; mySigen app monitoring, AI energy planning and OTA updates are included. Whole-home backup requires the separate Sigen Energy Gateway and provides 0ms switchover. The system must stay connected to the internet — installer sources report Sigenergy cuts the warranty to 5 years if the system is offline for more than one year in total; a 4G dongle is available where Wi-Fi does not reach. | N/A |
| PowerDiff | Wi-Fi, Ethernet, Bluetooth and 4G (WLAN / Fast Ethernet / RS485 per datasheets), via mySigen app; local API for Home Assistant reported by third-party reviews. Battery 5-54.24 kWh per stack (1-6 modules, 5.2-9.04 kWh nominal per module, 100% depth of discharge, LiFePO4); inverter output 3. | 100-240V AC 50/60Hz, 10A maximum resistive load |
| Plug / voltageDiff | Unknown | Screw terminal block for phase, neutral, load, and physical external switch contacts |
| DimensionsDiff | Unknown | 39.5 x 33 x 16.8 mm; 27 g |
| Best forDiff | Global B2B hardware distributors, specialty retail, and system integrators in smart-home evaluating Sigenergy (see power specs). Restricted to certified pro-installer, clinical, or enterprise quote channels. | Smart home installers, electrical contractors, and residential integrators modernizing existing wall switches into Matter-compliant nodes without rewiring switchplates. |
| Key limitationDiff | Installer-only system with no public pricing and no DIY installation; whole-home backup needs the extra Sigen Energy Gateway (about GBP 1,295 fitted in the UK / AUD 890-1,990 in Australia per installers). Voluntary safety recall in Australia (ACCC PRA 2025/20703, 19 Nov 2025): single-phase EC 8.0/10.0/12.0 kW SP AU energy controllers sold 4 Mar-18 Nov 2025, whose quick-connect AC plugs could overheat (fire risk; no property damage or injuries reported); remedy is a free replacement controller with updated plug plus 2 extra years of warranty. V2X is limited by the EV's capabilities and pending standards, with support via future OTA. Newer brand with a younger service footprint than Tesla/Enphase; warranty is tiered (gateway 5 years, power sensor/communications modules 2 years per third-party reviews). | Requires a neutral wire inside the electrical junction box; 10A max resistive load is not rated for heavy commercial HVAC compressors or EV chargers. |
| MOQDiff | Unknown | Commercial / OEM tiered MOQ confirmed per configuration |
| SampleDiff | Unknown | Evaluation unit available via B2B desk / authorized OEM channel |
| Lead timeDiff | Unknown | Confirmed per regional SKU & customization scope |
| CustomizationDiff | Unknown | OEM/ODM, API integration & regional packaging scoped per volume |
| UpdatedDiff | 2026-11-12 | 2026-11-20 |
Preview your deliverable
smart-home · Destination market to confirm
What we know now
Sigenergy SigenStor
Sigenergy · SigenStor EC (single-phase 5.0-12.0 kW / three-phase up to 30 kW controllers; battery modules BAT 5.0/6.0/8.0/9.0/10.0)
- Power
- Wi-Fi, Ethernet, Bluetooth and 4G (WLAN / Fast Ethernet / RS485 per datasheets), via mySigen app; local API for Home Assistant reported by third-party reviews. Battery 5-54.24 kWh per stack (1-6 modules, 5.2-9.04 kWh nominal per module, 100% depth of discharge, LiFePO4); inverter output 3.
- Plug
- Unknown
- MOQ
- Unknown
- Sample
- Unknown
SONOFF MINIR4M Matter Smart Switch Module
SONOFF · MINIR4M
- Power
- 100-240V AC 50/60Hz, 10A maximum resistive load
- Plug
- Screw terminal block for phase, neutral, load, and physical external switch contacts
- MOQ
- Commercial / OEM tiered MOQ confirmed per configuration
- Sample
- Evaluation unit available via B2B desk / authorized OEM channel
What our desk verifies
We request written terms and match lab reports to the proposed model and destination.
Sigenergy SigenStor · SigenStor EC (single-phase 5.0-12.0 kW / three-phase up to 30 kW controllers; battery modules BAT 5.0/6.0/8.0/9.0/10.0)
Request documentation for Plug, MOQ, Sample.
- Authorized regional B2B distributor MOQ, wholesale tier pricing, and territorial exclusivity
- Full FCC, CE RED, RoHS, and UN38.3 / IEC safety compliance test reports
- Warranty RMA spare-parts provisioning and long-term firmware/API support SLA
SONOFF MINIR4M Matter Smart Switch Module · MINIR4M
- Bulk master carton quantities and direct factory freight forwarding terms
- Customized silk-screen branding options on outer fire-retardant PC enclosure
What you receive
A comparison of three factory responses with supporting evidence and outstanding requests.
| Terms | Factory A | Factory B | Factory C |
|---|---|---|---|
| FOB Tier | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| MOQ | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Sample Lead Time | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Primary Lab Cert Scope | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Tooling/Branding Terms | Awaiting evidence | Awaiting evidence | Awaiting evidence |
When the 48-business-hour clock starts
Delivered within 48 business hours after brief intake and material confirmation. The $199 audit fee is credited once toward your first qualifying SmartLife100 coordination fee. Includes 30 days of Radar Pro.

