Compare · up to 4
Side-by-side comparison
Pre-PO Procurement Audit
Screening of listed fields only. Confirm destination input ratings, plugs and documentation before a PO.
MOQ or sample terms need confirmation
1 selected SKU(s) lack documented MOQ or sample terms. Request written terms and confirm the supply route before a PO.
Review documentation before approval
2 selected SKU(s) are not marked Verified. Review evidence and open questions before a PO.
![]() | ![]() | |
|---|---|---|
| Category | Smart Home | Smart Home |
| ModelDiff | EMV3A-2P-WH | Shelly Pro 2PM |
| Documentation | Docs under review | Docs under review |
| Sourcing trackDiff | MOQ or sample terms need confirmation | Documented MOQ/sample terms (verify factory terms before PO) |
| ProtocolsDiff | Wi-Fi | Wi-Fi, Bluetooth LE |
| AppDiff | Emporia Energy app | Shelly Smart Control / Direct Web Server / Home Assistant / MQTT |
| GatewayDiff | No separate hub required; connects directly to Wi-Fi | Operates standalone with direct RJ45 Ethernet or Wi-Fi; no proprietary hub required |
| AI / Cloud | N/A | N/A |
| PowerDiff | 120 V AC via a 15 A or 20 A breaker and neutral bar; voltage sensing up to 264 V AC line to neutral | 110-240V AC 50/60Hz, max 16A per channel, max 25A aggregate |
| Plug / voltageDiff | Hardwired 120 V AC via 15 A or 20 A breaker | Hardwired DIN-rail screw terminals (1 DIN module standard form factor) |
| DimensionsDiff | 3.5 x 1.25 x 2.25 in | 96 x 19 x 69 mm; 75 g |
| Best forDiff | Homeowners, electricians, and distributors serving residential energy monitoring and solar self-consumption projects | Commercial electrical panel builders, building management system (BMS) engineers, and renewable energy installers needing panel-mounted sub-circuit automation. |
| Key limitationDiff | Requires installation inside the electrical panel by a qualified installer; Monitor Only kit was out of stock at review time, so only sensor kits are listed; no local data storage without an internet connection | Requires professional installation inside a breaker panel or DIN-rail enclosure; not suitable for standard residential wall backboxes. |
| MOQDiff | Unknown | Commercial / OEM tiered MOQ confirmed per configuration |
| SampleDiff | Unknown | Evaluation unit available via B2B desk / authorized OEM channel |
| Lead timeDiff | Unknown | Confirmed per regional SKU & customization scope |
| CustomizationDiff | Unknown | OEM/ODM, API integration & regional packaging scoped per volume |
| UpdatedDiff | 2026-11-11 | 2026-11-20 |
Preview your deliverable
smart-home · Destination market to confirm
What we know now
Emporia Vue 3 Home Energy Monitor
Emporia · EMV3A-2P-WH
- Power
- 120 V AC via a 15 A or 20 A breaker and neutral bar; voltage sensing up to 264 V AC line to neutral
- Plug
- Hardwired 120 V AC via 15 A or 20 A breaker
- MOQ
- Unknown
- Sample
- Unknown
Shelly Pro 2PM Professional DIN-Rail Dual Relay
Shelly · Shelly Pro 2PM
- Power
- 110-240V AC 50/60Hz, max 16A per channel, max 25A aggregate
- Plug
- Hardwired DIN-rail screw terminals (1 DIN module standard form factor)
- MOQ
- Commercial / OEM tiered MOQ confirmed per configuration
- Sample
- Evaluation unit available via B2B desk / authorized OEM channel
What our desk verifies
We request written terms and match lab reports to the proposed model and destination.
Emporia Vue 3 Home Energy Monitor · EMV3A-2P-WH
Request documentation for MOQ, Sample.
- Authorized B2B distributor MOQ, regional exclusivity, and tiered wholesale pricing
- Availability of the Monitor Only kit for B2B orders
- FCC ID and CE RED certification documents for bulk import
Shelly Pro 2PM Professional DIN-Rail Dual Relay · Shelly Pro 2PM
- UL 61010-1 commercial panelboard certification documentation for US commercial tenders
- Tiered discount structure for master electrical distributor wholesale stocking orders
What you receive
A comparison of three factory responses with supporting evidence and outstanding requests.
| Terms | Factory A | Factory B | Factory C |
|---|---|---|---|
| FOB Tier | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| MOQ | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Sample Lead Time | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Primary Lab Cert Scope | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Tooling/Branding Terms | Awaiting evidence | Awaiting evidence | Awaiting evidence |
When the 48-business-hour clock starts
Delivered within 48 business hours after brief intake and material confirmation. The $199 audit fee is credited once toward your first qualifying SmartLife100 coordination fee. Includes 30 days of Radar Pro.

