Compare · up to 4
Side-by-side comparison
Pre-PO Procurement Audit
Screening of listed fields only. Confirm destination input ratings, plugs and documentation before a PO.
MOQ or sample terms need confirmation
1 selected SKU(s) lack documented MOQ or sample terms. Request written terms and confirm the supply route before a PO.
Review documentation before approval
2 selected SKU(s) are not marked Verified. Review evidence and open questions before a PO.
![]() | ![]() | |
|---|---|---|
| Category | Smart Accessories | Smart Accessories |
| ModelDiff | Breez Lite | MK117 |
| Documentation | Docs under review | Docs under review |
| Sourcing trackDiff | MOQ or sample terms need confirmation | Documented MOQ/sample terms (verify factory terms before PO) |
| ProtocolsDiff | Wi-Fi | Wi-Fi, Matter, Bluetooth LE |
| AppDiff | Cielo Home | Matter Ecosystems (Apple Home, Google Home, Alexa) / MOKO Energy App / MQTT Server |
| GatewayDiff | None required — direct 2.4 GHz Wi-Fi; controls AC units over infrared | Matter controller or direct 2.4 GHz Wi-Fi router; optional direct MQTT broker |
| AI / Cloud | N/A | N/A |
| PowerDiff | 5 V DC, 0.2 W; USB adapter with cable included | 100-240V AC 50/60Hz, 16A maximum load |
| Plug / voltageDiff | USB power adapter — regional plug varies by retail SKU | Regional mains plug and pass-through receptacle (US NEMA 5-15, EU Schuko CEE 7/7, UK BS 1363 variants) |
| DimensionsDiff | Unknown | 75 x 50 x 38 mm; 85 g |
| Best forDiff | Budget buyers adding app and voice control to a single ductless mini-split, window or portable air conditioner; renters who need a wall-mountable controller without replacing the unit. | Energy management solution providers, building sub-metering contractors, and IoT software platforms seeking commercial smart metering plug hardware. |
| Key limitationDiff | Requires an air conditioner with an infrared remote and a 2.4 GHz Wi-Fi network; no built-in display or onboard controls; must stay in line of sight of the air conditioner. | Requires Wi-Fi network coverage at each outlet socket; maximum 16A resistive rating must not be exceeded on heavy inductive commercial motor loads. |
| MOQDiff | Unknown | Commercial / OEM tiered MOQ confirmed per configuration |
| SampleDiff | Unknown | Evaluation unit available via B2B desk / authorized OEM channel |
| Lead timeDiff | Unknown | Confirmed per regional SKU & customization scope |
| CustomizationDiff | Unknown | OEM/ODM, API integration & regional packaging scoped per volume |
| UpdatedDiff | 2026-11-11 | 2026-11-20 |
Preview your deliverable
accessories · Destination market to confirm
What we know now
Cielo Breez Lite Smart AC Controller
Cielo · Breez Lite
- Power
- 5 V DC, 0.2 W; USB adapter with cable included
- Plug
- USB power adapter — regional plug varies by retail SKU
- MOQ
- Unknown
- Sample
- Unknown
MOKO Smart MK117 Matter Smart Metering Plug
MOKO Smart · MK117
- Power
- 100-240V AC 50/60Hz, 16A maximum load
- Plug
- Regional mains plug and pass-through receptacle (US NEMA 5-15, EU Schuko CEE 7/7, UK BS 1363 variants)
- MOQ
- Commercial / OEM tiered MOQ confirmed per configuration
- Sample
- Evaluation unit available via B2B desk / authorized OEM channel
What our desk verifies
We request written terms and match lab reports to the proposed model and destination.
Cielo Breez Lite Smart AC Controller · Breez Lite
Request documentation for MOQ, Sample.
- The Cielo direct store buy button showed Out of Stock on 2026-11-11, so Amazon US is the verified purchase channel and the direct Amazon page read was blocked. Product dimensions are not stated on the official product page.
MOKO Smart MK117 Matter Smart Metering Plug · MK117
- Custom laser-engraved company logos and customized packaging MOQ thresholds
- Provisioning pre-generated Matter DAC certificates for commercial PKI roots
What you receive
A comparison of three factory responses with supporting evidence and outstanding requests.
| Terms | Factory A | Factory B | Factory C |
|---|---|---|---|
| FOB Tier | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| MOQ | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Sample Lead Time | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Primary Lab Cert Scope | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Tooling/Branding Terms | Awaiting evidence | Awaiting evidence | Awaiting evidence |
When the 48-business-hour clock starts
Delivered within 48 business hours after brief intake and material confirmation. The $199 audit fee is credited once toward your first qualifying SmartLife100 coordination fee. Includes 30 days of Radar Pro.

