Compare · up to 4
Side-by-side comparison
Pre-PO Procurement Audit
Screening of listed fields only. Confirm destination input ratings, plugs and documentation before a PO.
Confirm unspecified input ratings
1 selected SKU(s) have unknown or ambiguous voltage fields. Request input ratings and destination plug details.
MOQ or sample terms need confirmation
1 selected SKU(s) lack documented MOQ or sample terms. Request written terms and confirm the supply route before a PO.
Review documentation before approval
2 selected SKU(s) are not marked Verified. Review evidence and open questions before a PO.
![]() | ![]() | |
|---|---|---|
| Category | AI Devices | AI Devices |
| ModelDiff | Frame | PanaCast 50 |
| Documentation | Docs under review | Docs under review |
| Sourcing trackDiff | MOQ or sample terms need confirmation | Documented MOQ/sample terms (verify factory terms before PO) |
| ProtocolsDiff | Bluetooth LE | Wi-Fi, Bluetooth LE |
| AppDiff | Frame Lua API and compatible host SDK | Jabra Direct / Jabra Xpress Cloud Management / Microsoft Teams Admin |
| GatewayDiff | Bluetooth host for applications that use external inference. | RJ45 Gigabit Ethernet port or USB 3.0 Type-C connection to in-room computing host |
| AI / CloudDiff | Lua runs on the glasses. A host may process captures locally or send them to a cloud model. · Running a local Lua program incurs no model tokens. Paid API calls depend on the model and credentials configured by the developer. | Edge Edge-AI architecture calculates panoramic video stitching and participant counting entirely on-box · Jabra Xpress device management is free; room system licenses per platform vendor |
| PowerDiff | Rechargeable glasses | 100-240V AC power adapter, 12V 5A DC input |
| Plug / voltageDiff | Unknown | Regional mains plug (NEMA 1-15P, CEE 7/16, or BS 1363) |
| DimensionsDiff | Unknown | 650 x 80 x 125 mm; 2.2 kg |
| Best forDiff | Developers evaluating a transparent, programmable image-to-text workflow on existing Frame units. | Commercial workplace infrastructure managers, government agencies, and higher-education lecture rooms requiring wall-to-wall video coverage with zero blind spots. |
| Key limitationDiff | The integrator owns the host app, model choice and access policy. Confirm access to original Frame hardware before planning a pilot. | Panoramic video requires straight wall mounting below central display to avoid perspective distortion; heavier weight requires sturdy wall anchors. |
| MOQDiff | Unknown | Commercial / OEM tiered MOQ confirmed per configuration |
| SampleDiff | Unknown | Evaluation unit available via B2B desk / authorized OEM channel |
| Lead timeDiff | Unknown | Confirmed per regional SKU & customization scope |
| CustomizationDiff | Unknown | OEM/ODM, API integration & regional packaging scoped per volume |
| UpdatedDiff | 2026-11-22 | 2026-11-20 |
Preview your deliverable
ai-devices · Destination market to confirm
What we know now
Brilliant Labs Frame Programmable AI Glasses
Brilliant Labs · Frame
- Power
- Rechargeable glasses
- Plug
- Unknown
- MOQ
- Unknown
- Sample
- Unknown
Jabra PanaCast 50 Intelligent Video Bar
Jabra · PanaCast 50
- Power
- 100-240V AC power adapter, 12V 5A DC input
- Plug
- Regional mains plug (NEMA 1-15P, CEE 7/16, or BS 1363)
- MOQ
- Commercial / OEM tiered MOQ confirmed per configuration
- Sample
- Evaluation unit available via B2B desk / authorized OEM channel
What our desk verifies
We request written terms and match lab reports to the proposed model and destination.
Brilliant Labs Frame Programmable AI Glasses · Frame
Request documentation for Plug, MOQ, Sample.
- Which original Frame units, replacement chargers and firmware versions can the team support?
- Are the FCC or EU RED documents and battery UN 38.3 summary available for the original Frame revision?
Jabra PanaCast 50 Intelligent Video Bar · PanaCast 50
- Firmware API rate limits for polling live occupant counts into third-party BMS controllers
- Channel partner tiered wholesale volume agreement terms
What you receive
A comparison of three factory responses with supporting evidence and outstanding requests.
| Terms | Factory A | Factory B | Factory C |
|---|---|---|---|
| FOB Tier | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| MOQ | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Sample Lead Time | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Primary Lab Cert Scope | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Tooling/Branding Terms | Awaiting evidence | Awaiting evidence | Awaiting evidence |
When the 48-business-hour clock starts
Delivered within 48 business hours after brief intake and material confirmation. The $199 audit fee is credited once toward your first qualifying SmartLife100 coordination fee. Includes 30 days of Radar Pro.

