Compare · up to 4
Side-by-side comparison
Pre-PO Procurement Audit
Screening of listed fields only. Confirm destination input ratings, plugs and documentation before a PO.
MOQ or sample terms need confirmation
1 selected SKU(s) lack documented MOQ or sample terms. Request written terms and confirm the supply route before a PO.
Review documentation before approval
2 selected SKU(s) are not marked Verified. Review evidence and open questions before a PO.
![]() | ![]() | |
|---|---|---|
| Category | Smart Accessories | Smart Accessories |
| ModelDiff | HM-G01E | MK117 |
| Documentation | Docs under review | Docs under review |
| Sourcing trackDiff | MOQ or sample terms need confirmation | Documented MOQ/sample terms (verify factory terms before PO) |
| ProtocolsDiff | Wi-Fi, Zigbee, Bluetooth LE, Matter, Thread | Wi-Fi, Matter, Bluetooth LE |
| AppDiff | Aqara Home | Matter Ecosystems (Apple Home, Google Home, Alexa) / MOKO Energy App / MQTT Server |
| GatewayDiff | No hub required; this device is the hub. Acts as a Matter controller, Matter bridge, and Thread border router; 360-degree IR blaster built in. | Matter controller or direct 2.4 GHz Wi-Fi router; optional direct MQTT broker |
| AI / Cloud | N/A | N/A |
| PowerDiff | USB-C or PoE | 100-240V AC 50/60Hz, 16A maximum load |
| Plug / voltageDiff | USB power adapter — regional plug varies by retail SKU | Regional mains plug and pass-through receptacle (US NEMA 5-15, EU Schuko CEE 7/7, UK BS 1363 variants) |
| DimensionsDiff | 105 x 105 x 36.5 mm | 75 x 50 x 38 mm; 85 g |
| Best forDiff | Homes standardizing on Matter and Thread that already use Aqara sensors, switches, and locks, and buyers who want one hub for Zigbee, Thread, IR, and Matter bridging. | Energy management solution providers, building sub-metering contractors, and IoT software platforms seeking commercial smart metering plug hardware. |
| Key limitationDiff | Zigbee radio works with Aqara Zigbee devices only, not third-party Zigbee devices. A newer Hub M200 is listed on Amazon, although the M3 remains in sale. No microphone or camera. | Requires Wi-Fi network coverage at each outlet socket; maximum 16A resistive rating must not be exceeded on heavy inductive commercial motor loads. |
| MOQDiff | Unknown | Commercial / OEM tiered MOQ confirmed per configuration |
| SampleDiff | Unknown | Evaluation unit available via B2B desk / authorized OEM channel |
| Lead timeDiff | Unknown | Confirmed per regional SKU & customization scope |
| CustomizationDiff | Unknown | OEM/ODM, API integration & regional packaging scoped per volume |
| UpdatedDiff | 2026-11-11 | 2026-11-20 |
Preview your deliverable
accessories · Destination market to confirm
What we know now
Aqara Hub M3
Aqara · HM-G01E
- Power
- USB-C or PoE
- Plug
- USB power adapter — regional plug varies by retail SKU
- MOQ
- Unknown
- Sample
- Unknown
MOKO Smart MK117 Matter Smart Metering Plug
MOKO Smart · MK117
- Power
- 100-240V AC 50/60Hz, 16A maximum load
- Plug
- Regional mains plug and pass-through receptacle (US NEMA 5-15, EU Schuko CEE 7/7, UK BS 1363 variants)
- MOQ
- Commercial / OEM tiered MOQ confirmed per configuration
- Sample
- Evaluation unit available via B2B desk / authorized OEM channel
What our desk verifies
We request written terms and match lab reports to the proposed model and destination.
Aqara Hub M3 · HM-G01E
Request documentation for MOQ, Sample.
- Confirm whether the Hub M200 supersedes the M3 for new Aqara deployments, and confirm the included power adapter for US retail stock.
MOKO Smart MK117 Matter Smart Metering Plug · MK117
- Custom laser-engraved company logos and customized packaging MOQ thresholds
- Provisioning pre-generated Matter DAC certificates for commercial PKI roots
What you receive
A comparison of three factory responses with supporting evidence and outstanding requests.
| Terms | Factory A | Factory B | Factory C |
|---|---|---|---|
| FOB Tier | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| MOQ | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Sample Lead Time | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Primary Lab Cert Scope | Awaiting evidence | Awaiting evidence | Awaiting evidence |
| Tooling/Branding Terms | Awaiting evidence | Awaiting evidence | Awaiting evidence |
When the 48-business-hour clock starts
Delivered within 48 business hours after brief intake and material confirmation. The $199 audit fee is credited once toward your first qualifying SmartLife100 coordination fee. Includes 30 days of Radar Pro.

